At a glance
Record the expected aircraft response, its supporting evidence and who will resolve any open points for the agreed configuration.
Before accepting a tethered system, make sure your team and supplier share the same understanding of what the aircraft is expected to do if ground power is lost. A component feature alone does not establish the response of the complete installation.
What to record before signoff
Use this record alongside your project’s acceptance form. Refer to the aircraft, battery, controller and other relevant equipment and versions in the agreed configuration.
- Expected response. Describe the expected aircraft-level response to loss of ground power in the agreed configuration, including any conditions or limits that matter to the acceptance decision.
- Evidence. Identify the evidence supporting that response, the exact configuration and conditions it covers, the date and who issued or approved it. Check that it applies to the system being accepted; a document for a different configuration may leave questions open.
- Open items. List unresolved points, who is responsible for each and what must be agreed before signoff. Keep a requirement separate from a response supported by evidence.
Continue the discussion
See our battery backup guide for how the battery may fit into the setup. Send Stella your aircraft model and the battery or controller version. If your team already uses an acceptance form, share it so we can discuss what to document for your configuration.

