At a glance

Use the equipment list from your first job to see what may carry over. Check site power first when the site changes, and aircraft power and mounting when the aircraft changes.

You have a tethered drone setup that works. The next job might use a different aircraft, carry a heavier camera or run from a different power source. Before you order another set of equipment, work out what you could keep from the first setup and what needs to be checked again.

Start with the equipment you actually used

Pull up the model numbers for your ground station, reel and tether, airborne power module, aircraft and payload. Note the site supply, who supplied each part and any changes you made during installation. Add the operating height and, if you have measurements, the sustained load and the size and duration of short peaks.

Check what changes on the next job

What you might keep What to check
Ground station and reel Available AC voltage, phase and frequency, other equipment sharing the supply, and space for the reel and crew.
Tether and connections Cable route and length, documented connections, cable weight carried by the aircraft and the voltage reaching the airborne module under load.
Airborne power module Aircraft input voltage range, steady demand and brief peaks, plus the space, weight and cooling available for installation.
Payload and battery arrangement Changes to payload power, mounting and data connections, and how the aircraft responds if ground power is lost.

Moving the same aircraft and payload to another site? Start with the AC supply and cable route. A different cable setup can change the voltage reaching the aircraft under load. Keeping the site and changing aircraft? Start with the new aircraft’s power and mounting requirements, then check the ground station and tether against the new load. Our guide to matching the ground station and airborne module walks through those connections.

Can I keep my ground station and tether when I switch airborne modules?

Start with the interface documents from each supplier. Match each document to the manufacturer, part number and revision on the equipment you have. A matching plug still leaves the electrical interface to verify.

List any known modifications. If a fault prompted the replacement, include the fault report and the equipment versions in use at the time. Ask Stella which parts we can quote and which interfaces still need review.

Get a quote for what you need

Mark each item as unchanged, changed or to check. Note which equipment you already have and which parts you want to buy. Where a connection or load changes, ask what else it affects and what needs checking before the system goes into service.

Send Stella your equipment list and the first change you know about. A new aircraft model or a description of the available power supply is enough to start. We can discuss what you may be able to keep and what belongs in the next quote.

Discuss your project

Tell Stella about the equipment you use or the application you have in mind. We can discuss the options and a quotation.

Related guides

Search in English

Search TethPower

Start with a model or a topic, such as M400 or tethered power.

    Live chat

    Talk to Stella about a product or your project. You can also continue on WhatsApp.

    Privacy choices

    Cookie settings

    Choose which optional services may run. You can change this choice at any time from the footer.

    Necessary

    Stores your privacy choice and supports essential website security and forms.

    Always on

    Live chat

    Loads Tawk when you open chat. The service may use cookies and local storage to provide the conversation.